Product Overview
Barrel Porting Package for Factory OEM PDP Slides
-Reduced Recoil with our Slide and Barrel Porting Packages
-Includes Slide Window Cutout and Barrel Ports
4-8 weeks Lead Time for Raw and Cerakoted Options
SHIP ASAP TO:
ROCKET CITY STIPPLING LLC
19644 SPENCE CAVE RD.
ELKMONT, AL 35620